Bernard Kamya of Kamya Consulting Ltd and Reed Ellis of Stantec Group, collaborate on Masonry Arch Bridge Assessment-June 2018
Bernard Kamya of Kamya Consulting Ltd undertook a specialist masonry arch spandrel wall load assessment to BS5628/EC6 for Ellis Reed Vice President, Bridges Stantec Group in June 2018. The masonry arch is of coral stone construction with spandrel walls of 21m high, built in 1800s in the Carribeans. The masonry arch bridge is to be subjected to abnormal load movement of wind turbines and the load assessment was to verify the suitability of the existing spandrel to withstand load pressures during the abnormal load movement over the bridge.
Kamya Consulting Ltd's Bernard Kamya signs agreement with Edinburgh Napier University for short term specialist industry expert May 2018.
Bernard Kamya has been undertaking specialist industry expert assignments to Edinburgh Napier University as part-time lecturer under zero hours contract since September 2006. From May 2018 Zero hours contract have been changed to short term specialst industry expert assignment.
Bernard undertakes the following lecture assignments.
a) Construction Contracts and contract proceedures, with emphasis on New Engineering Contract NEC. For undergraduates, post graduates and industry professionals.
b) Waste Management. Covering the EU waste framework directives, National legislative framework and Regulatory control. Compliance for households and industry. Lecturing to post graduate and industry professionals.
c) Strategic Management: Construction production management and strategic control. To post graduate and industry professionals.
Kamya Consulting Ltd's Bernard Kamya assigned under Atkins Global to AWPR project as Design Site Engineer's Representative (DSER)-Structures, South Section for 21 months June 2016-Feb 2018
Bernard has been DSER (Design Site Engineer Representative) -Structures in the South section on the AWPR (Aberdeen Western Peripheral Route) project for 21 months. Key responsibility included dealing with onsite technical queries, construction material approvals and design, construction and material non-conformance issues on site. The role was to provide design onsite support to the contractor in effective interpretation and translation of designer intent to the contractor during the construction process.
Southern Leg: 18.7km from Charleston to North Kingswells, included 13 bridges to south of new Maryculter Bridge of Dee
Fastlink: 11.5km from Stonehaven to Cleanhill, included 6 bridges.
The section also included 18 culverts
Bernard Kamya signs agreement in Feb 2018 with Edinburgh Napier University to produce Global Online teaching material notes in Production Management Essentials.
Kamya Consulting Ltd, Bernard Kamya signed agreement with Edinburgh Napier University in Feb 2018 to produce for Global Online teaching material notes in Production Management Essentials, covering the following units.
a) Human Resources
b) Plant and Equipment
c) Sub-Contractors
d) Materials Management
e) Construction as a Manufacturing Process
f) The role of Construction Scheduling in Production Performance.
Business Activity
Kamya Consulting is a consulting firm specialising in providing tailor made solutions to private and public clients. The core area of business is structural design and inspection of bridges and buildings. Experience accumulated from inspections has enabled the creation of training material useful for organisations to improve technical capacity for management and maintenance of infrastructure assets.
Papers published:
- A case for training engineers in rope access methods, Surrey 2005
- Bridge inspections, a case for trained bridge inspectors. IABMAS 06, Porto Portugal
- Bridge Management: A challange for Local Authorities. IABMAS 08, Seoul South Korea
- Bridge inspections: Are we getting it right? IABMAS10 conference Philadelphia USA
- Bridge management system, challenges of adopting a bridge management system appropriate to the needs of a local authority-example from the United Kingdom, IABMAS12
Training Seminars in EA
- Design and Inspection of Bridge Structures examples from the UK. 2006. MOW-Uganda
Collaboration with Edinburgh Napier University
Discussions are ongoing to setup a framework collaboration of providing training material for capacity building in the infrastructure projects.